Tommy Baldwin cuts cables as he removes a server rack from a room in building 500 Feb. 26. The facility is being renovated to house the Strategic Automated Command and Control System.
| Date Taken: | 02.26.2020 |
| Date Posted: | 03.05.2020 17:04 |
| Photo ID: | 6127842 |
| VIRIN: | 200226-F-OH250-1102 |
| Resolution: | 5930x3959 |
| Size: | 16.19 MB |
| Location: | US |
| Web Views: | 35 |
| Downloads: | 3 |
This work, New construction begins at Offutt, SACCS to receive new home [Image 16 of 16], by TSgt William OBrien, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.