A server rack is disassembled to be removed as a room in building 500 is renovated for the Strategic Automated Command and Control System Feb. 26.
| Date Taken: | 02.26.2020 |
| Date Posted: | 03.05.2020 17:05 |
| Photo ID: | 6127806 |
| VIRIN: | 200226-F-OH250-1017 |
| Resolution: | 5147x3429 |
| Size: | 10.19 MB |
| Location: | US |
| Web Views: | 98 |
| Downloads: | 8 |
This work, New construction begins at Offutt, SACCS to receive new home [Image 16 of 16], by TSgt William OBrien, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.