An electrician runs new power lines to the added calibration areas in the Army Primary Standards Laboratory on Redstone Arsenal, Alabama. The lab is receiving a top-to-bottom, $32 million renovation which includes all new utilities and communication systems throughout the building.
Date Taken: | 10.03.2019 |
Date Posted: | 10.30.2019 15:56 |
Photo ID: | 5873177 |
VIRIN: | 191003-A-HD610-138 |
Resolution: | 2736x1824 |
Size: | 3.2 MB |
Location: | REDSTONE ARSENAL, ALABAMA, US |
Web Views: | 25 |
Downloads: | 3 |
This work, APSL electrical work [Image 2 of 2], by Miles Brown, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.