Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Construction work at Poplar Island expansion site [Image 1 of 5]

    Construction work at Poplar Island expansion site

    POPLAR ISLAND, MD, UNITED STATES

    04.13.2017

    Photo by David Gray 

    U.S. Army Corps of Engineers, Baltimore District

    Large rocks are placed at the expansion site in April 2016 to armor dikes that will
    eventually contain dredged material from the approach channels to the Port of Baltimore. The expansion, authorized by Congress in 2007, allowed the project to expand beyond Poplar Island’s 1846 footprint to create an additional 575 acres of dredged material containment and environmental restoration. Construction of the expansion containment cells is set to wrap-up in summer 2020. (U.S. Army photo by David Gray)

    LEAVE A COMMENT

    IMAGE INFO

    Date Taken: 04.13.2017
    Date Posted: 07.26.2019 10:02
    Photo ID: 5615502
    VIRIN: 170413-A-ND890-1002
    Resolution: 5760x3840
    Size: 4.31 MB
    Location: POPLAR ISLAND, MD, US

    Web Views: 72
    Downloads: 5

    PUBLIC DOMAIN