Sharon Demeaux (left), lead structural engineer for the Hydroelectric Design Center in Portland, Ore., discusses facility issues involved with the Cordell Hull Dam Switchyard. A combined technical team from HDC and the U.S. Army Corps of Engineers Nashville District met at Cordell Hull Dam March 6, 2012, to begin a district-wide assessment of the switchyards at nine hydropower project sites.
| Date Taken: | 03.06.2012 |
| Date Posted: | 03.08.2012 17:41 |
| Photo ID: | 537866 |
| VIRIN: | 120306-A-EO110-001 |
| Resolution: | 4288x2848 |
| Size: | 4.44 MB |
| Location: | CARTHAGE, TENNESSEE, US |
| Web Views: | 28 |
| Downloads: | 1 |
This work, Nashville District, Hydroelectric Design Center charged to assess switchyards [Image 7 of 7], by Leon Roberts, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.