Contractors with Platt Construction of Tomah, Wis., work on the construction of a salt/sand storage facility Jan. 9, 2019, at Fort McCoy, Wis. Platt Construction received a $555,000 contract to build the facility that will be 70 feet wide by 88 feet deep. The new facility will be capable of storing 2,000 tons of salt and 2,000 tons of sand with a partition between the two products. The facility is designed to prevent direct contact of the salt with precipitation or with run-off from rain or ice and snow melt. Fort McCoy's Directorate of Public Works is monitoring the project construction. (U.S. Army Photo by Scott T. Sturkol, Public Affairs Office, Fort McCoy, Wis.)
Date Taken: | 01.16.2019 |
Date Posted: | 01.18.2019 11:02 |
Photo ID: | 5040915 |
VIRIN: | 190116-A-OK556-942 |
Resolution: | 5407x3605 |
Size: | 2.57 MB |
Location: | FORT MCCOY, WISCONSIN, US |
Web Views: | 6 |
Downloads: | 2 |
This work, New salt/sand storage building under construction at Fort McCoy [Image 21 of 21], by Scott Sturkol, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.