Slurry is pumped from the project's drilling sites from the work ramp at Wolf Creek Dam May 27. The contractor Treviicos Soletanche JV carefully filters it to protect the environment.
| Date Taken: | 05.27.2011 |
| Date Posted: | 06.22.2011 12:17 |
| Photo ID: | 418966 |
| VIRIN: | 110527-A-EO110-005 |
| Resolution: | 4288x2848 |
| Size: | 5.13 MB |
| Location: | JAMESTOWN, KENTUCKY, US |
| Web Views: | 22 |
| Downloads: | 3 |
This work, Wolf Creek Dam noisy work quietly moves forward [Image 13 of 13], by Leon Roberts, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.