Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Generator maintenance integral to Puerto Rico temporary emergency power mission [Image 2 of 3]

    Generator maintenance integral to Puerto Rico temporary emergency power mission

    Much like a car engine, generators require regular maintenance in order to function at optimal levels. The USACE temporary emergency power mission ensures federal generators in Puerto Rico are fully mission capable before they are installed at facilities across the island. If they fail any checks before installation, or require maintenance that cannot be completed on site once installed, the generators are sent to a pier in San Juan for repairs. Here, a contractor makes sure the fuel filter is working properly on a generator Jan. 14.

    LEAVE A COMMENT

    IMAGE INFO

    Date Taken: 01.14.2018
    Date Posted: 01.15.2018 18:14
    Photo ID: 4076628
    VIRIN: 180114-O-JP287-622
    Resolution: 5367x3578
    Size: 3.98 MB
    Location: PR

    Web Views: 48
    Downloads: 8

    PUBLIC DOMAIN