Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Generator maintenance integral to Puerto Rico temporary emergency power mission [Image 1 of 3]

    Generator maintenance integral to Puerto Rico temporary emergency power mission

    Jim Wade (left), from the U.S. Army Corps of Engineers Walla Walla District, and Manny Rutinel (right), from the USACE Buffalo District, coordinate maintenance operations at a pier in San Juan for the USACE temporary emergency power mission in Puerto Rico Jan. 14. The pier serves as a "repair shop" and staging area for incoming federal generators, which are used to provide temporary emergency power to critical public facilities in the aftermath of Hurricane Maria.

    LEAVE A COMMENT

    IMAGE INFO

    Date Taken: 01.14.2018
    Date Posted: 01.15.2018 18:14
    Photo ID: 4076624
    VIRIN: 180114-O-JP287-561
    Resolution: 5171x3448
    Size: 3.59 MB
    Location: PR

    Web Views: 50
    Downloads: 9

    PUBLIC DOMAIN