A large crane is positioned to move steel pieces in to place as the first hangar for the KC-46 'Pegasus' tanker maintenance campus is erected Dec. 11, 2017, Tinker Air Force Base, Oklahoma. The steel structure is being erected and secured in place using heavy nuts and bolts encased in massive concrete footers as seen at the bottom of the photo. (U.S. Air Force photo/Greg L. Davis)
Date Taken: | 12.11.2017 |
Date Posted: | 12.13.2017 12:49 |
Photo ID: | 4026139 |
VIRIN: | 171211-F-VV898-1029 |
Resolution: | 3642x2428 |
Size: | 1.49 MB |
Location: | OKLAHOMA CITY, OK, US |
Web Views: | 52 |
Downloads: | 12 |
This work, KC-46 maintenance campus construction progress [Image 6 of 6], by Greg L. Davis, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.
LEAVE A COMMENT