(e.g. yourname@email.com)

Forgot Password?

    Digital Visual Information Distribution System Logo

    2017 troop projects improve installation operations; more planned for 2018 [Image 5 of 9]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    The image shows an outdoor covered picnic area with multiple wooden picnic tables arranged under a timber-framed roof structure. The shelter is situated adjacent to white-sided institutional or military-style buildings with a concrete walkway leading toward it. Several orange traffic cones and loose cables are visible near the structure, suggesting recent installation or ongoing work.

    A picnic shelter that was completed as part of a troop project is shown Sept. 20, 2017, on the cantonment area at Fort McCoy, Wis. The shelter was built next to the Mission Installation Contracting Command-McCoy building. Troop projects are a regular part of planned improvements at Fort McCoy each year and are coordinated by the Directorate of Public Works at the installation. (U.S. Army Photo by Scott T. Sturkol, Public Affairs Office, Fort McCoy, Wis.)

    IMAGE INFO

    Date Taken: 09.20.2017
    Date Posted: 10.04.2017 09:28
    Photo ID: 3833843
    VIRIN: 170920-A-OK556-6747
    Resolution: 5472x3648
    Size: 7.42 MB
    Location: FORT MCCOY, WISCONSIN, US

    Web Views: 11
    Downloads: 3

    PUBLIC DOMAIN