Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Airmen complete crater repair training [Image 4 of 7]

    Airmen complete crater repair training

    YOKOTA AIR BASE, TOKYO, JAPAN

    01.12.2017

    Photo by Senior Airman David Owsianka 

    374th Airlift Wing

    A member of the 374th Civil Engineer Squadron drills a hole in the ground during a simulated crater repair scenario at Yokota Air Base, Japan, Jan. 12, 2017. In a real world scenario, the Airmen will ensure the ground is level prior to placing a mat over the crater to ensure aircraft can land and takeoff from the flight line. (U.S. Air Force photo by Staff Sgt. David Owsianka)

    LEAVE A COMMENT

    IMAGE INFO

    Date Taken: 01.12.2017
    Date Posted: 01.17.2017 22:53
    Photo ID: 3102612
    VIRIN: 170112-F-CB366-043
    Resolution: 5010x3281
    Size: 6.97 MB
    Location: YOKOTA AIR BASE, TOKYO, JP

    Web Views: 14
    Downloads: 14

    PUBLIC DOMAIN