A typical view of the channel looking upstream from one of the rock grade control structures. Natural channel conditions and adjoining habitat areas were preserved with minimal disruption.
| Date Taken: | 07.14.2016 |
| Date Posted: | 09.14.2016 10:49 |
| Photo ID: | 2852907 |
| VIRIN: | 160714-A-CE999-005 |
| Resolution: | 800x597 |
| Size: | 436.11 KB |
| Location: | KANSAS CITY, MISSOURI, US |
| Web Views: | 18 |
| Downloads: | 2 |
This work, After three-decades, Blue River Corridor flood risk management project complete [Image 3 of 3], must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.