Canadian Forces’ Master Cpl. David Blier, a heavy equipment operator, and Cpl. Jeremie Trottier a combat engineer, both with the 5e régiment du génie de combat, Quebec, Canada, replace boards on the surface of the French Creek bridge at Custer, S.D., June 14, 2016. The Canadian engineers placed the boards in a staggered pattern to support the surface of the bridge as vehicles crossed the bridge during the 32nd Golden Coyote training exercise, hosted by the South Dakota National Guard.
Date Taken: | 06.14.2016 |
Date Posted: | 06.17.2016 11:41 |
Photo ID: | 2668091 |
VIRIN: | 160614-Z-BP728-036 |
Resolution: | 2843x4265 |
Size: | 1.34 MB |
Location: | CUSTER, SOUTH DAKOTA, US |
Web Views: | 23 |
Downloads: | 2 |
This work, Canadian engineers resurface French Creek bridge in Custer [Image 6 of 6], by SGT Kristin Lichius, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.