Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Canadian engineers resurface French Creek bridge in Custer [Image 3 of 6]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    Canadian engineers resurface French Creek bridge in Custer

    CUSTER, SOUTH DAKOTA, UNITED STATES

    06.14.2016

    Photo by Spc. Kristin Lichius 

    129th Mobile Public Affairs Detachment

    Canadian Forces’ Sapper Christopher Cormier-Godin, a heavy equipment operator with the 5e régiment du génie de combat, Quebec, Canada, cuts boards to be used in a bridge re-surfacing project at French Creek at Custer, S.D., June 14, 2016. Once cut, the boards are placed to create a level surface for vehicles crossing the bridge during the Golden Coyote training exercise, hosted by the South Dakota National Guard.

    IMAGE INFO

    Date Taken: 06.14.2016
    Date Posted: 06.17.2016 11:41
    Photo ID: 2668084
    VIRIN: 160614-Z-BP728-018
    Resolution: 3456x5184
    Size: 2.31 MB
    Location: CUSTER, SOUTH DAKOTA, US

    Web Views: 32
    Downloads: 4

    PUBLIC DOMAIN