Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Depot excellence displayed by 561st AMXS with heavy structural repair [Image 5 of 6]

    Depot excellence displayed by 561st AMXS with heavy structural repair

    WARNER ROBINS, GA, UNITED STATES

    08.12.2015

    Photo by Tommie Horton 

    78th Air Base Wing

    Christopher Watson, 561st Aircraft Maintenance Squadron sheet metal mechanic, installs fasteners into the newly replaced 626 bulkhead of an F-15C. During programmed depot maintenance, a crack was discovered in the original bulkhead leaving the organization with the option to replace the part or scrap the entire aircraft. The aircraft was placed into an unscheduled depot level maintenance gate where the bulkhead was replaced with another located through the Defense Logistics Agency supply chain. The entire process from aircraft disassembly to new bulkhead installation took the core team seven weeks to complete. (U.S. Air Force photo by Tommie Horton)

    LEAVE A COMMENT

    IMAGE INFO

    Date Taken: 08.12.2015
    Date Posted: 08.18.2015 13:01
    Photo ID: 2122069
    VIRIN: 150812-F-UI543-002
    Resolution: 5520x3680
    Size: 10.17 MB
    Location: WARNER ROBINS, GA, US

    Web Views: 147
    Downloads: 12

    PUBLIC DOMAIN