Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Phase maintenance ensures aircrafts remain battle ready [Image 3 of 3]

    Phase maintenance ensures aircrafts remain battle ready

    Taping off controls and buttons, Spc Zack Taylor, from Stockton, Calif., an AH-64D Apache attack helicopter mechanic in Company B, 615th Aviation Support Battalion, 1st Air Cavalry Brigade, 1st Cavalry Division, Multi-National Division-Baghdad, prepares the crewstation of an Apache to be painted during a 500 hour phase maintenance inspection, Sept. 21. Conducting a 500 hour inspection is a critical part of finding small issues and preventing those issues becoming major problems during flight.

    LEAVE A COMMENT

    IMAGE INFO

    Date Taken: 09.21.2009
    Date Posted: 09.22.2009 06:57
    Photo ID: 205831
    VIRIN: 090922-A-4817Z-003
    Resolution: 1200x1800
    Size: 422.08 KB
    Location: CAMP TAJI, IQ

    Web Views: 103
    Downloads: 21

    PUBLIC DOMAIN