A Stryker from Company B, 299th Brigade Engineer Battalion, 1st Stryker Brigade Combat Team, 4th Infantry Division, tests a deployed bridge during horizontal construction training, Feb. 5, 2015. Long antennas span the length of the bridge to guide vehicles across.
Date Taken: | 02.05.2015 |
Date Posted: | 02.10.2015 13:33 |
Photo ID: | 1761752 |
VIRIN: | 150205-A-FE868-865 |
Resolution: | 5184x3456 |
Size: | 4.78 MB |
Location: | FORT CARSON, CO, US |
Web Views: | 51 |
Downloads: | 12 |
This work, 299th engineers bulldoze through new specifications [Image 5 of 5], by SFC William Howard, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.
LEAVE A COMMENT