Pfc. Gustavo Rayas, horizontal construction engineer, Company B, 299th Brigade Engineer Battalion, 1st Stryker Brigade Combat Team, 4th Infantry Division, builds a gap with a bulldozer during horizontal construction training, Feb. 5, 2015. This was the seventh training exercise for the engineers, who have been adjusting their standard operating procedures since brigade’s transition from a mechanized unit to a Stryker brigade in March 17, 2014.
Date Taken: | 02.05.2015 |
Date Posted: | 02.10.2015 13:35 |
Photo ID: | 1761747 |
VIRIN: | 150205-A-FE868-708 |
Resolution: | 5184x3456 |
Size: | 5.92 MB |
Location: | FORT CARSON, CO, US |
Web Views: | 18 |
Downloads: | 4 |
This work, 299th engineers bulldoze through new specifications [Image 5 of 5], by SFC William Howard, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.
LEAVE A COMMENT