The last form is removed from the first completed massive monolith from a viewpoint over the construction site in Grand Rivers, Ky., Jan. 28, 2015. The U.S. Army Corps of Engineers Nashville District and contractor, Thalle Construction, participated in the event commemorating this first important milestone.(USACE photo by Leon Roberts)
Date Taken: | 01.28.2015 |
Date Posted: | 01.28.2015 17:51 |
Photo ID: | 1739816 |
VIRIN: | 150128-A-EO110-003 |
Resolution: | 4288x2848 |
Size: | 4.8 MB |
Location: | GRAND RIVERS, KENTUCKY, US |
Web Views: | 25 |
Downloads: | 3 |
This work, Work crews top out Kentucky Lock’s first concrete monolith [Image 5 of 5], by Leon Roberts, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.