Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Engineers compose bridge across Arkansas River [Image 3 of 13]

    Engineers compose bridge across Arkansas River

    FORT CHAFFEE, AR, UNITED STATES

    07.23.2014

    Photo by Staff Sgt. Debralee Lutgen 

    412th Theater Engineer Command

    U.S. Army Reserve engineer Soldiers with the 416th and 412th Theater Engineer Commands open a bridge bay on the Arkansas River during the during the assembly of an improved ribbon bridge across the river, July 23 at Fort Chaffee, Ark., during Operation River Assault. Forty-two bays were used to construct the bridge across the 300-meter gap. (U.S. Army photo by Staff Sgt. Debralee Best)

    LEAVE A COMMENT

    IMAGE INFO

    Date Taken: 07.23.2014
    Date Posted: 07.25.2014 00:19
    Photo ID: 1463663
    VIRIN: 140723-A-FW423-725
    Resolution: 4269x1927
    Size: 1.49 MB
    Location: FORT CHAFFEE, AR, US

    Web Views: 89
    Downloads: 10

    PUBLIC DOMAIN