Sam Rayburn Lake Manager Bart Dearborn inspects the lake to ensure there is no oil residue remaining after completing cleanup of a non-hazardous release of insulating transformer oil that discharged April 28 in the river channel downstream of the Sam Rayburn Power Plant.
| Date Taken: | 05.20.2014 |
| Date Posted: | 06.19.2014 12:49 |
| Photo ID: | 1408027 |
| VIRIN: | 140520-A-KB629-361 |
| Resolution: | 3216x2136 |
| Size: | 3.92 MB |
| Location: | JASPER, TEXAS, US |
| Web Views: | 90 |
| Downloads: | 1 |
This work, Playbook execution yields clean slate for Sam Rayburn Lake [Image 2 of 2], by Randy Cephus, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.