(e.g. yourname@email.com)

Forgot Password?

    Digital Visual Information Distribution System Logo

    Operation Unified Response [Image 39 of 41]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    A marine construction operation is underway in a harbor, where a large lattice-boom crane mounted on a yellow work barge is driving a steel pipe pile into the seabed using a vibratory hammer (green attachment). The barge is positioned in calm, turquoise harbor waters with an industrial port facility visible in the background. At least two workers are visible on the barge deck overseeing the pile-driving operation.

    PORT-AU-PRINCE, HAITI

    02.11.2010

    Courtesy Photo

    Defense Imagery Management Operations Center     

    Salvage technicians from the Resolve Pioneer, a savage tug, drive in anchoring piles in the main seaport of Port-au-Prince, Haiti. The piles will allow large crane barges to moor in the port and remove wreckage from the harbor. Resolve Pioneer is owned by Resolve Marine Group Inc. and specializes in construction and harbor clearing. (U.S. Navy photo by Mass Communication Specialist 2nd Class Chris Lussier/Released)

    IMAGE INFO

    Date Taken: 02.11.2010
    Date Posted: 05.09.2014 22:48
    Photo ID: 1326824
    VIRIN: 100211-N-SX809-084
    Resolution: 1020x1532
    Size: 356.29 KB
    Location: PORT-AU-PRINCE, HT

    Web Views: 40
    Downloads: 3

    PUBLIC DOMAIN