Builder 2nd Class Mason Lynn completes framing in preparation for the installation of drywall. Naval Mobile Construction Battalion (NMCB) 74 Detail (DET) Panama City Beach (PCB) is in the process of demolishing and replacing fixtures, tile, and walls, in the renovation of a restroom as well as demolishing and replacing 1,600 linear feet of concrete and asphalt sidewalk during their two-month stay onboard Naval Support Activity Panama City (NSA PC).
Date Taken: | 03.26.2014 |
Date Posted: | 04.04.2014 02:52 |
Photo ID: | 1222192 |
VIRIN: | 140301-N-ZZ999-006 |
Resolution: | 480x640 |
Size: | 94.12 KB |
Location: | PANAMA CITY BEACH, FLORIDA, US |
Web Views: | 12 |
Downloads: | 1 |
This work, NMCB 74 in Panama City Beach [Image 4 of 4], must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.
LEAVE A COMMENT