Builder 1st Class Shane Carroll performs quality control while the sidewalk project crew installs form work and takes measurements. Naval Mobile Construction Battalion (NMCB) 74 Detail (DET) Panama City Beach (PCB) is in the process of demolishing and replacing 1,600 linear feet of concrete and asphalt sidewalk as well as demolishing and replacing fixtures, tile, and walls in the renovation of a restroom during their two-month stay onboard Naval Support Activity Panama City (NSA PC).
Date Taken: | 03.24.2014 |
Date Posted: | 04.04.2014 02:53 |
Photo ID: | 1222183 |
VIRIN: | 140301-N-ZZ999-003 |
Resolution: | 2448x3264 |
Size: | 3.54 MB |
Location: | PANAMA CITY BEACH, FLORIDA, US |
Web Views: | 9 |
Downloads: | 1 |
This work, NMCB 74 in Panama City Beach [Image 4 of 4], must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.
LEAVE A COMMENT