Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Maintenance inspection on track at Laurel River Dam [Image 3 of 6]

    Maintenance inspection on track at Laurel River Dam

    LONDON, KY, UNITED STATES

    10.29.2013

    Photo by Mark Rankin 

    U.S. Army Corps of Engineers, Nashville District

    Wolf Creek Power Plant Superintendent Chris Marlowe, in charge of the maintenance standing down stream of the Laurel River Dam explains the procedures a group of electrical and mechanical engineers from the Wolf Creek power plant are performing during a maintenance inspection which consists of setting the head and tailgates, draining the penstock, examining the generator turbine, and wicket gates and inspecting the electrical and mechanical components of the generator.

    LEAVE A COMMENT

    IMAGE INFO

    Date Taken: 10.29.2013
    Date Posted: 11.07.2013 14:22
    Photo ID: 1048514
    VIRIN: 131029-A-BO243-368
    Resolution: 3264x2448
    Size: 5.42 MB
    Location: LONDON, KY, US

    Web Views: 17
    Downloads: 1

    PUBLIC DOMAIN