Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    The light at the end of the tunnel [Image 2 of 3]

    The light at the end of the tunnel

    BAGRAM, AFGHANISTAN

    09.26.2013

    Photo by Alicia Embrey 

    U.S. Army Corps of Engineers Headquarters

    Project management and construction engineers’ discuss the final repairs of Salang Tunnel during a September 2013 meeting with engineers with Omran Holding Group.
    The tunnel repairs, funded by the Commander’s Emergency Response Program, consists of the construction, improvement and reconstruction of new pavement and the drainage system within the Salang Tunnel, an electrical power plant for the lighting and ventilation systems, fuel storage, a camera monitoring system, and necessary site work for the Ministry of Public Works (MoPW) in the Parwan Province of the Salang Pass.

    LEAVE A COMMENT

    IMAGE INFO

    Date Taken: 09.26.2013
    Date Posted: 10.11.2013 08:14
    Photo ID: 1033929
    VIRIN: 130926-A-UF257-003
    Resolution: 4288x2848
    Size: 7.54 MB
    Location: BAGRAM, AF

    Web Views: 183
    Downloads: 11

    PUBLIC DOMAIN