Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Electricians at Wolf Creek Power Plant complete fix on a differential [Image 4 of 10]

    Electricians at Wolf Creek Power Plant complete fix on a differential

    NASHVILLE, TN, UNITED STATES

    07.24.2013

    Photo by Mark Rankin 

    U.S. Army Corps of Engineers, Nashville District

    Luke Ditto, (left) and Allen Hay, (right) both electronics mechanisc from the Electronic Service Section uses a computer and a vacuum circuit breaker to analyze current capabilities, stress tests generator number three at the Wolf Creek Power Plant.

    LEAVE A COMMENT

    IMAGE INFO

    Date Taken: 07.24.2013
    Date Posted: 09.25.2013 13:24
    Photo ID: 1025711
    VIRIN: 130724-A-BO243-016
    Resolution: 2848x4288
    Size: 5.54 MB
    Location: NASHVILLE, TN, US

    Web Views: 9
    Downloads: 0

    PUBLIC DOMAIN