Primary construction of Wright Field lasted from 1926-1929. During that time, staff moved all of McCook’s experimental equipment, disassembled buildings, and recycled materials in order to save money for Wright Field construction. (NMUSAF)
| Date Taken: | 06.01.2018 |
| Date Posted: | 11.19.2026 14:57 |
| Photo ID: | 10106404 |
| VIRIN: | 180601-F-EG995-6285 |
| Resolution: | 5507x4439 |
| Size: | 2.14 MB |
| Location: | US |
| Web Views: | 10 |
| Downloads: | 3 |
This work, Aiming Higher [Image 65 of 65], by Kenneth M McNulty, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.