A video showcasing Sailors assigned to the Nimitz-class aircraft carrier USS Dwight D. Eisenhower (CVN 69) and civilian contractors from Norfolk Naval Shipyard (NNSY) working to get IKE back into the fight, Nov. 17, 2025. Eisenhower is moored at NNSY for a Planned Incremental Availability maintenance period. (U.S. Navy video by Mass Communication Specialist Seaman Jamison Sutton)
| Date Taken: | 11.17.2025 |
| Date Posted: | 12.21.2025 08:40 |
| Category: | Video Productions |
| Video ID: | 991111 |
| VIRIN: | 251117-N-FC769-1001 |
| Filename: | DOD_111451486 |
| Length: | 00:01:25 |
| Location: | US |
| Downloads: | 0 |
| High-Res. Downloads: | 0 |
This work, Ike Conducts Planned Incremental Availability maintenance period, by SN Jamison Sutton, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.