In preparation for the U.S. Army's 250th Birthday Celebration in Washington, D.C., on June 14, 2025, the III Armored Corps initiated railhead operations during the week of May 18 at the Rail Operations Center on Fort Cavazos. Over several days, Soldiers from the 1st Cavalry Division staged a range of armored platforms including M1A2 SEPv3 Abrams tanks, M109A7 Paladins, M2A3 Bradleys, and M1126 Strykers alongside various support vehicles. Following detailed inspections and validation, the vehicles were loaded onto railcars by a coordinated team of Soldiers and civilian personnel.
Date Taken: | 05.21.2025 |
Date Posted: | 05.22.2025 21:50 |
Category: | Video Productions |
Video ID: | 963816 |
VIRIN: | 250521-O-IA164-5105 |
Filename: | DOD_111016220 |
Length: | 00:00:30 |
Location: | FORT CAVAZOS, TEXAS, US |
Downloads: | 8 |
High-Res. Downloads: | 8 |
This work, III Corps Conducts Railhead Operations Preparing for Army 250th Celebration, by Christopher Davis, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.