Great news for Fort Wainwright! Construction has started on the $34 million dollar Aquatic Center funded through our Army MWR construction fund. The Aquatic Center will be located between the Physical Fitness Center and the Exchange. The nearly 30,000 square foot facility will house a 25-meter pool, splash pad area, zero entry depth pool with fun water features like water sprayers and dump buckets, slides and adult pool deck. Melaven pool will stay open as a mission pool to support Soldier Readiness. The Aquatic Center is due to open in the Spring of 2024.
Date Taken: | 07.29.2022 |
Date Posted: | 08.16.2022 12:54 |
Category: | Package |
Video ID: | 854351 |
VIRIN: | 220729-A-VX201-1001 |
Filename: | DOD_109168614 |
Length: | 00:01:04 |
Location: | FORT WAINWRIGHT, ALASKA, US |
Downloads: | 5 |
High-Res. Downloads: | 5 |
Asset contains copyrighted material
Portions of the asset are subject to restrictions under U.S. copyright law and are not licensed for distribution. Please contact us for details.