Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    U.S. Army Corps of Engineers Dallas Floodway Project Pump Station Testing

    Advanced Embed Example

    Add the following CSS to the header block of your HTML document.

    Then add the mark-up below to the body block of the same document.

    DALLAS, TX, UNITED STATES

    08.03.2020

    Video by Trevor Welsh 

    U.S. Army Corps of Engineers, Fort Worth District

    As part of the Dallas Floodway Bipartisan Act Supplemental Project, USACE Fort Worth, in partnership with the City of Dallas, is building new pump stations and refurbishing existing pump stations to give increased flood protection to the citizens of Dallas. In this video Sarvi Ashraf, Lead Engineer for the Dallas Supplemental; Robert Powell, Dallas Floodway Operations Manager; and Sarah Standifer, Assistant Director for Dallas Water Utilities talk about the nearly complete Able Pump Station, the largest pump station on the Trinity River, which is undergoing testing by the City of Dallas. As an integral part of the city’s interior drainage and flood control system, these pump stations move water from the city, over the levees into the river.

    LEAVE A COMMENT

    VIDEO INFO

    Date Taken: 08.03.2020
    Date Posted: 08.13.2020 16:32
    Category: Package
    Video ID: 763285
    VIRIN: 200803-A-ZS026-295
    Filename: DOD_107939051
    Length: 00:01:47
    Location: DALLAS, TX, US

    Video Analytics


    Downloads: 0
    High-Res. Downloads: 0

    PUBLIC DOMAIN