Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Sacramento River East Levee Improvements, Reach 8 and 9

    Advanced Embed Example

    Add the following CSS to the header block of your HTML document.

    Then add the mark-up below to the body block of the same document.

    SACRAMENTO, CA, UNITED STATES

    06.11.2020

    Courtesy Video

    U.S. Army Corps of Engineers, Sacramento District

    Construction crews install a 700-foot-long cutoff wall to reduce seepage and stability issues along Reaches 8 and 9 of the Sacramento River East Levee, part of the U.S. Army Corps of Engineer's American River Common Features Water Resources Development Act of 2016 Project to further reduce flood risk in the Sacramento region, California, June 11, 2020. (Aerial video by USACE Sacramento District Aviation Section)

    LEAVE A COMMENT

    VIDEO INFO

    Date Taken: 06.11.2020
    Date Posted: 06.23.2020 18:42
    Category: B-Roll
    Video ID: 757117
    VIRIN: 200611-A-A1419-1006
    Filename: DOD_107865159
    Length: 00:00:56
    Location: SACRAMENTO, CA, US

    Video Analytics


    Downloads: 12
    High-Res. Downloads: 12

    PUBLIC DOMAIN