Contractors conducting soil treatment to ensure stable soil prior to barrier emplacement.
Date Taken: | 05.29.2019 |
Date Posted: | 06.06.2019 16:49 |
Category: | B-Roll |
Video ID: | 686916 |
VIRIN: | 190529-A-VX611-2001 |
Filename: | DOD_106855359 |
Length: | 00:00:14 |
Location: | PHOENIX, AZ, US |
Downloads: | 3 |
High-Res. Downloads: | 3 |
This work, Task Force Barrier, by Richard Brown, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.
LEAVE A COMMENT