Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Ground breaking for Hawaii Army National Guard Combined Support Maintenance Shop #2

    Advanced Embed Example

    Add the following CSS to the header block of your HTML document.

    Then add the mark-up below to the body block of the same document.

    180208-Z-IX631-001
    Broll

    Ground breaking for Hawaii Army National Guard Combined Support Maintenance Shop #2 (CSMS#2) In Hilo, Hawaii.

    1.  Contractor - Alutiiq General Contractors, LLC
    2.  Architectural and Engineering - Burns & McDonnell
    3.  Representative District:  2nd
    4.  Senatorial District: 1st
    5.  Scope: The new Combined Support Maintenance Shop (CSMS) facility will include administrative and shop space, vehicle work bays, vehicle loading ramp, enclosed vehicle storage buildings, outdoor military vehicle parking, controlled waste/flammable storage, vehicle wash platforms, fuel tanks and vehicle fueling facility, storm water basins, septic systems, privately owned vehicle parking, access roads, fences, gates, trash and recycling enclosures, signage, and utility connections.  The new buildings will be designed and constructed to meet Leadership in Environmental and Energy Design (LEED) Silver.  New building will be a fully functional vehicle maintenance facility compliant with all codes, standards, and regulations will stand when this project is completed which will allow soldiers to work in facilities that are safe and efficient.  The completed project will facilitate Hawaii Army National Guard's ability to accomplish its federal mission and meet its readiness objectives and state mission to support to Civilian Authorities during natural disasters.
    6. Details
            Project Site (Building Seat On): 429,000 SF (9.85 Acres)
            Building Footprint:     36,400  SF
            Equipment: Paint booth, Fueling point station and Vehicle Wash rack.
            Total design and construction costs is $29.5M
            Estimated construction completion: Dec 2019
    7.  Background on old CSMS#2
    The Combined Support Maintenance Shop currently consists of approximately 24,800 SF in six buildings and sheds constructed in the 1954.  It does not meet current code requirements to include: Americans with Disabilities Act (ADA), and Anti-terrorism Force Protection (ATFP).   It lacks adequate maintenance areas, administrative space, supply room/tool room space, toilets/showers, physical fitness space, locker room space, and military vehicle parking.
    8.  KMR is a 505 acre property located in Hilo on the eastern side of the Big Island.


    SOT - 00:01:10:31 - Staff Sgt. Alan Hudman - Chief Inspector Combined Support Maintenance Shop.

    LEAVE A COMMENT

    VIDEO INFO

    Date Taken: 02.08.2018
    Date Posted: 02.08.2018 17:34
    Category: B-Roll
    Video ID: 583791
    VIRIN: 180208-Z-IX631-001
    Filename: DOD_105303720
    Length: 00:01:23
    Location: HILO, HI, US

    Video Analytics


    Downloads: 2
    High-Res. Downloads: 2

    PUBLIC DOMAIN