Spiral 2 Technical Demonstration for Port Improvement via Exigent Repair Joint Capability Technology Demonstration: The Spiral 2 Technical Demonstration for PIER JCTD was recently held in Vicksburg, Mississippi, led by Dr. Mike Hammons. Spiral 2 demonstrated logistical agility via expedient mechanical repair kit sets developed by GSL for degraded pier substructure repair or reinforcement. Kit sets were installed on a simulated pier structure above and below water by divers from CHL’s Field Data Collection and Analysis Branch. Proof load tests were conducted by GSL’s Structural Analysis and Experimentation Team. Stakeholders and collaborators from multiple government entities attended.
Date Taken: | 09.06.2017 |
Date Posted: | 09.06.2017 11:10 |
Category: | Package |
Video ID: | 548394 |
VIRIN: | 170906-A-BM524-001 |
Filename: | DOD_104808312 |
Length: | 00:01:47 |
Location: | VICKSBURG, MS, US |
Downloads: | 3 |
High-Res. Downloads: | 3 |
This work, PIER JCTD Spiral 2, by Stacy Tennison, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.
LEAVE A COMMENT