    Hydropower Rotor Install Requires Heavy Lifting

    Advanced Embed Example

    Add the following CSS to the header block of your HTML document.

    Then add the mark-up below to the body block of the same document.

    LANCASTER, TN, UNITED STATES

    06.19.2017

    Video by Leon Roberts 

    U.S. Army Corps of Engineers, Nashville District

    The U.S. Army Corps of Engineers Nashville District and contractor Voith Hydro installed a 249-ton hydropower rotor June 19, 2017 at Center Hill Dam in Lancaster, Tenn., culminating weeks of safety preparations to lift and maneuver the heavy load into position to generate hydroelectricity. The rehabilitation of the hydropower generator is expected to be complete in late July with its final assembly and load testing.

    LEAVE A COMMENT

    VIDEO INFO

    Date Taken: 06.19.2017
    Date Posted: 06.21.2017 12:56
    Category: Package
    Video ID: 533571
    VIRIN: 170619-A-EO110-025
    Filename: DOD_104512611
    Length: 00:01:36
    Location: LANCASTER, TN, US

    Video Analytics


    Downloads: 5
    High-Res. Downloads: 5

    PUBLIC DOMAIN