Wes James, civil engineer for the U.S. Army Corps of Engineers Sacramento District, explains the Corps’ construction of a second wind turbine at Tooele Army Depot, Utah, and additional renewable energy projects that will bring the installation closer to producing all of its own energy needs. The $6.5 million wind turbine project is scheduled to be complete later this year. Full story: http://go.usa.gov/czsF9
Date Taken: | 04.18.2016 |
Date Posted: | 01.23.2017 20:08 |
Category: | Newscasts |
Video ID: | 506490 |
VIRIN: | 160418-A-AN535-001 |
Filename: | DOD_104017188 |
Length: | 00:01:46 |
Location: | UTAH, US |
Downloads: | 22 |
High-Res. Downloads: | 22 |
This work, Second wind turbine brings Tooele Army Depot closer to net zero energy, by John Prettyman, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.