Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Second wind turbine brings Tooele Army Depot closer to net zero energy

    Advanced Embed Example

    Add the following CSS to the header block of your HTML document.

    Then add the mark-up below to the body block of the same document.

    Wes James, civil engineer for the U.S. Army Corps of Engineers Sacramento District, explains the Corps’ construction of a second wind turbine at Tooele Army Depot, Utah, and additional renewable energy projects that will bring the installation closer to producing all of its own energy needs. The $6.5 million wind turbine project is scheduled to be complete later this year. Full story: http://go.usa.gov/czsF9

    LEAVE A COMMENT

    VIDEO INFO

    Date Taken: 04.18.2016
    Date Posted: 01.23.2017 20:08
    Category: Newscasts
    Video ID: 506490
    VIRIN: 160418-A-AN535-001
    Filename: DOD_104017188
    Length: 00:01:46
    Location: UT, US

    Video Analytics


    Downloads: 22
    High-Res. Downloads: 22

    PUBLIC DOMAIN