Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Improved Ribbon Bridge (IRB)

    Advanced Embed Example

    Add the following CSS to the header block of your HTML document.

    Then add the mark-up below to the body block of the same document.

    FORT CHAFFEE, ARKANSAS, UNITED STATES

    09.07.2016

    Video by Stacy Tennison 

    U.S. Army Corps of Engineers, Engineer Research and Development Center   

    A team of engineers, scientists and student interns from ERDC’s laboratories recently instrumented an Improved Ribbon Bridge river crossing operation on the Arkansas River (July 2016). The annual exercise, spearheaded by the 467th Engineer Battalion, involved four Army and Marine bridging companies. The troops weren’t the only one learning from the experience: our Coastal and Hydraulics Laboratory Field Data Collection Branch instrumented the bridge with advanced sensors and mapped the bathymetry, currents and water levels of the river. This high-resolution data will validate ERDC's dynamic, 3D model of the IRB to inform anchorage system requirements and tradespace analyses within ERDC's Engineered Resilient Systems.

    VIDEO INFO

    Date Taken: 09.07.2016
    Date Posted: 09.12.2016 10:43
    Category: Package
    Video ID: 482302
    VIRIN: 160907-A-BM524-001
    Filename: DOD_103644598
    Length: 00:01:06
    Location: FORT CHAFFEE, ARKANSAS, US

    Video Analytics


    Downloads: 8
    High-Res. Downloads: 8

    PUBLIC DOMAIN