The U.S. Army Corps of Engineers Los Angeles District is overseeing a $4M bridge construction project in Nogales, Ariz. The project will consist of constructing a two-span, I-girder concrete bridge, install associated road base and approach slabs, and placing grouted riprap both upstream and downstream of the project in the channel.
Date Taken: | 04.09.2014 |
Date Posted: | 04.17.2014 15:42 |
Category: | Newscasts |
Video ID: | 330754 |
VIRIN: | 140417-A-TV651-002 |
Filename: | DOD_101379976 |
Length: | 00:02:41 |
Location: | NOGALES, AZ, US |
Downloads: | 1 |
High-Res. Downloads: | 1 |
This work, Nogales Wash bridge project back underway, by Daniel J. Calderón, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.
LEAVE A COMMENT