CARTHAGE, Tenn. (March 6, 2012) – The process of collecting and transmitting electricity generated from hydropower charged a team of experts today to assess and determine the status of structures and components at the Cordell Hull Dam Switchyard.
| Date Taken: | 03.06.2012 |
| Date Posted: | 03.08.2012 19:19 |
| Category: | B-Roll |
| Video ID: | 139239 |
| VIRIN: | 120306-A-EO110-008 |
| Filename: | DOD_100340202 |
| Length: | 00:01:37 |
| Location: | CARTHAGE, TENNESSEE, US |
| Downloads: | 21 |
| High-Res. Downloads: | 21 |
This work, Nashville District, Hydroelectric Design Center charged to assess switchyards, by Leon Roberts, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.