Story by Scott Sturkol | Fort McCoy Public Affairs Office | 09.02.2021
Going into 2021, a long list of troop projects needed to be completed at Fort McCoy, said Troop Project Coordinator Larry Morrow with the Directorate of Public Works....
Story by Sgt. 1st Class Jessica Espinosa | 416th Theater Engineer Command | 08.19.2021
FORT MCCOY, Wisconsin – Soldiers with the 416th Theater Engineer Command premiered the first U. S. Army Reserve bridge building training site during a ribbon cutting ceremony Aug. 19. Bridge crewmembers will use the Line of Communication – Bridge site, also known as LOC-B, to train on setting up hasty, retractable passages over difficult terrain areas, such as trenches and rivers to be......
Story by Zachary Mott | 88th Readiness Division | 06.23.2021
Taking a wooded, uneven plot of land and turning it into the first-of-its-kind training site for the Army Reserve allowed engineers from the 416th Theater Engineer Command to make the most of their annual training mission here, June 15, 2021....