Photo by Airman 1st Class Tala Hunt | Joint Base Elmendorf-Richardson | 12.13.2024
From left: U.S. Air Force Col. Jeremy Oldham, 673d Civil Engineer Group commander; Master Sgt. Chase Spilker, senior noncommissioned officer project lead for the building; and Chief Master Sgt. Marcus O’Connor, 673d Civil Engineer Group superintendent, pose for a photo at ribbon-cutting ceremony at Camp Madbull on Joint Base Elmendorf-Richardson, Alaska, Dec. 13, 2024. Airmen and civilians......
Photo by Airman 1st Class Tala Hunt | Joint Base Elmendorf-Richardson | 12.13.2024
Leadership and Airmen assigned to the 673d Civil Engineer Group gather for a ribbon-cutting ceremony at Camp Madbull on Joint Base Elmendorf-Richardson, Alaska, Dec. 13, 2024. Airmen and civilians from the 673d CEG worked for approximately six months to assemble a new K-Span building. The structure will protect equipment and allow operations to continue during Alaska’s harsh winter months,......
Photo by Airman 1st Class Tala Hunt | Joint Base Elmendorf-Richardson | 12.13.2024
U.S. Air Force Chief Master Sgt. Marcus O’Connor, 673d Civil Engineer Group superintendent, gives speech at a ribbon-cutting ceremony at Camp Madbull on Joint Base Elmendorf-Richardson, Alaska, Dec. 13, 2024. Airmen and civilians from the 673d CEG worked for approximately six months to assemble a new K-Span building. The structure will protect equipment and allow operations to continue......
Photo by Airman 1st Class Tala Hunt | Joint Base Elmendorf-Richardson | 12.13.2024
Leadership and Airmen assigned to the 673d Civil Engineer Group gather for a ribbon-cutting ceremony at Camp Madbull on Joint Base Elmendorf-Richardson, Alaska, Dec. 13, 2024. Airmen and civilians from the 673d CEG worked for approximately six months to assemble a new K-Span building. The structure will protect equipment and allow operations to continue during Alaska’s harsh winter months,......
Photo by Airman 1st Class Tala Hunt | Joint Base Elmendorf-Richardson | 12.13.2024
U.S. Air Force Col. Jeremy Oldham, 673d Civil Engineer Group commander, speaks at a ribbon-cutting ceremony at Camp Madbull on Joint Base Elmendorf-Richardson, Alaska, Dec. 13, 2024. Airmen and civilians from the 673d CEG worked for approximately six months to assemble a new K-Span building. The structure will protect equipment and allow operations to continue during Alaska’s harsh winter......
Photo by Airman 1st Class Tala Hunt | Joint Base Elmendorf-Richardson | 12.13.2024
Airmen assigned to the 673d Civil Engineer Group gather for a ribbon-cutting ceremony at Camp Madbull on Joint Base Elmendorf-Richardson, Alaska, Dec. 13, 2024. Airmen and civilians from the 673d CEG worked for approximately six months to assemble a new K-Span building. The structure will protect equipment and allow operations to continue during Alaska’s harsh winter months, bolstering rapid......
Photo by Seaman Travis Hanes | USS GEORGE WASHINGTON (CVN 73) | 03.04.2024
A graphic illustration informing Sailors aboard Nimitz-class aircraft carrier USS George Washington (CVN 73) on the application process for a passport. (U.S. Navy graphic illustration by Mass Communication Specialist Seaman Travis S. Hanes)...
Photo by Capt. Olivia Cobiskey-Haftmann | William Beaumont Army Medical Center | 08.21.2019
U.S. Army medic Spc. Blaik Seal and 1st Lt. Lauren Hill, a nurse, receive instruction on how to intubate a patient with severe burns during a new familiarization and validation program at the Fort Bliss Medical Simulation Center. Participants rotated through seven scenario as part of the new program developed by WBAMC staff. Each scenario uses several Individual Critical Task List (ICTL) items......