An aerial view shows construction progress on Dry Dock 5 (P-209) at Joint Base Pearl Harbor-Hickam, Hawaii, Aug. 7, 2026. Officer in Charge of Construction Pearl Harbor Naval Shipyard leads construction of the new dry dock, a key component of the Navy’s Shipyard Infrastructure Optimization Program and the modernization of Pearl Harbor Naval Shipyard and Intermediate Maintenance Facility. (U.S. Navy photo by DHO Joint Venture Released)
| Date Taken: | 08.07.2026 |
| Date Posted: | 08.31.2026 20:01 |
| Photo ID: | 9902112 |
| VIRIN: | 260807-N-HT002-5453 |
| Resolution: | 7108x2388 |
| Size: | 7.71 MB |
| Location: | JOINT BASE PEARL HARBOR-HICKAM, HAWAII, US |
| Web Views: | 10 |
| Downloads: | 0 |
This work, Dry Dock 5 (P-209) Aerial Construction Progress: August 2026, by Jhewel Felipe, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.