The St. Vrain Creek flood risk reduction project in Longmont, Colorado, led by the U.S. Army Corps of Engineers, Omaha District, is substantially complete. The project extends upstream from Boston Avenue past Sunset Street, with improvements in the Izaak Walton Reach 2 area pictured. The project is part of Longmont’s broader effort to improve flood resilience following the 2013 floods. (Photo courtesy of Jennifer Gitt)
| Date Taken: | 08.10.2026 |
| Date Posted: | 08.20.2026 08:29 |
| Photo ID: | 9879189 |
| VIRIN: | 260810-A-A5041-1001 |
| Resolution: | 4028x2685 |
| Size: | 1.87 MB |
| Location: | LONGMONT, COLORADO, US |
| Web Views: | 7 |
| Downloads: | 0 |
This work, St. Vrain Creek flood risk reduction project nears completion in Longmont [Image 3 of 3], must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.