U.S. Army Lt. Col. Scott King, center, commander of the 40th Engineer Battalion, 2nd Armored Brigade Combat Team, 1st Armored Division, digs into the ground to symbolize the start of the battalion’s motorpool expansion project at Fort Bliss, Texas, Aug. 14, 2026. The ceremony represents another step toward modernizing the installation and providing Soldiers with the infrastructure required to maintain a ready and lethal force. (U.S. Army photo by Sgt. Russell Savage V)
| Date Taken: | 08.14.2026 |
| Date Posted: | 08.17.2026 13:24 |
| Photo ID: | 9872767 |
| VIRIN: | 260814-A-CE530-1051 |
| Resolution: | 5573x3346 |
| Size: | 5.1 MB |
| Location: | FORT BLISS, TEXAS, US |
| Web Views: | 11 |
| Downloads: | 0 |
This work, 40th Engineer Battalion Motorpool Groundbreaking [Image 3 of 3], by SGT Russell Savage V, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.