After placing connecting concrete panels, the pier being repaired by Underwater Construction Team 2 on Ebeye Island in the Kwajalein Atoll is ready for concrete placement. (Photo By Petty Officer 2nd Class Michael Price)
| Date Taken: | 06.16.2013 |
| Date Posted: | 07.31.2013 17:18 |
| Photo ID: | 985494 |
| VIRIN: | 130616-N-ZZ999-005 |
| Resolution: | 5184x3456 |
| Size: | 7.46 MB |
| Location: | EBEYE ISLAND, MH |
| Web Views: | 254 |
| Downloads: | 16 |
This work, Kwajalein pier repair [Image 11 of 11], must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.