A Trident Pier assembled from Improved Navy Lighterage System components extends from Dogu Beach during Combined Joint Logistics Over-the-Shore (CJLOTS) 26 in Pohang, Republic of Korea, July 16, 2026. The floating pier allows personnel, vehicles and equipment to move from ships to shore without relying on established port infrastructure, increasing operational flexibility during contingency operations. (U.S. Army photo by Sang Won An)
| Date Taken: | 07.15.2026 |
| Date Posted: | 08.06.2026 03:19 |
| Photo ID: | 9853346 |
| VIRIN: | 260715-A-UP558-9539 |
| Resolution: | 5911x3940 |
| Size: | 3.28 MB |
| Location: | POHANG, KR |
| Web Views: | 2 |
| Downloads: | 0 |
This work, Trident Pier extends logistics ashore [Image 8 of 8], by SGT Deziree Keay, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.