A section of the new concrete culvert is lowered as Fort Drum Directorate of Public Works employees move it into position. DPW teams completed two vital infrastructure upgrades in July – replacing emergency power generators at the 10th Mountain Division (LI) headquarters and replacing a failing drainage culvert in the training area. (Fort Drum DPW Photo)
| Date Taken: | 07.02.2026 |
| Date Posted: | 07.24.2026 08:06 |
| Photo ID: | 9829737 |
| VIRIN: | 260702-A-XX986-1002 |
| Resolution: | 3000x2918 |
| Size: | 2.78 MB |
| Location: | FORT DRUM, NEW YORK, US |
| Web Views: | 1 |
| Downloads: | 0 |
This work, Fort Drum DPW enhances post infrastructure with major power and roadway projects [Image 4 of 4], by Michael Strasser, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.